Final Completion Phase for Hazelwood

When plans for Hazelwood were finalised an Agreement and Schedule of Conditions of Building Contract was signed on 29 April 1959 by RF Caple (Surveyor and Engineer) on behalf of HRDC, and Benjamin Merriman (building contractor). The contract referred to several architectural drawings one of which has been adapted from an original and reproduced below.
The original drawing is held by the Surrey Archives, Woking. The drawing is not made to scale